Local Issues
Elizabeth water reuse planning
Elizabeth’s proposed 2027 capital budget includes $125,000 for water reuse design and engineering; the specific system, scope and schedule are not stated.
Local Issues
Elizabeth’s proposed 2027 capital budget includes $125,000 for water reuse design and engineering; the specific system, scope and schedule are not stated.